中英文
can bee a vessel of the highest honour. Nowadays they give up gentleness and are all for being bold; economy, and are all for being liberal; the hindmost place,and seek only to be foremost; —— ( of
)是否点亮。 设为“DISABLE”则数码灯保持灭,设为 “ENABLE”则在系统启动时点亮数码灯。 Keyboard NumLock 键盘数码锁:该选项用来设置在系统 启动时是否提示键盘相关的错误信息。 Enable Keypad启用小键盘:设置为 “BY NUMLOCK”在 NumLock 灯亮并且没有接外接键盘时启用数字小键盘。 设置为 “Only By Key”在
置为 “BY NUMLOCK” 在 NumLock 灯亮并且没有接外接键盘时启用数字小键盘。 设置为 “Only By Key” 在 NumLock 灯亮时保持embedded 键区为禁用状态。 External Hot Key 外部热键:该设置可以在外接 PS/2 键盘上按照与使用笔记本电脑上的键的相同的方式使 用键。 如果您使用 ACPI 操作系统,如 Win2020 或WinXP,则
em domains. Traditional techniques are not efficient when the practical search space is too large. These algorithms are not robust. They are inclined to obtain a local optimal solution. Numerous
r fixtures needed? Can it easily be inspected? Can the workshop produce it? Is heat treatment necessary? Can parts be easily welded? 第 4页 Cost of operation. Are power requirements too large? What
nstringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more
liable uptodate information on excavators, loaders and transport is obtainable from the makers. Earthworks or earthmoving means cutting into ground where its surface is too high ( cuts ), and dumping
ellent, quakeproof, guards against has been hot, guards against electronmagetic interference ability, may move in the very severe working conditions, the cost may accept. uses the std main line or
eate Mode创建方式 Create Morph Key创建变形关键帧 Create New Set创建新集合 Create Normal Projected Curve创建法线投影曲线 Create Offset Curve创建偏移曲线 Create Offset Point创建偏移点 Create Offset Surface创建偏移表面;创建偏移曲面 Create Out of
onstitute a plying 汇通天下国际结算网( ) ICC Uniform Customs and Practice for Documentary Credits (UCP600) presentation, the confirming bank must: a. 倘若规定的单据被提交至保兑行或者任何其他被指定银行并构成相符提示,保兑行必须: i. honour, if the