中英文
inutes if necessary. Generally the following 2 conditions need be considered. One is whether our FP warehouse and workshop have the Procedure 程序 Issue 版本: 1 QFQA027/01 TITLE: Handling of Customer
equipment and manhour。 The price of the casting is easy。 Can adopt and make die casting up with other metal or nonmetallic materials . Assemble manhour save metal also sparingly. There are a lot of
t an altitude of 15005500 meters. The argali sheep in Hoh Xil inhabit on the alpine grasslands, deserts and meadows at an altitude of over 5,000 meters. They are active on the lower edge of the snow
plete filling of mold. Inplete Cavity Filling: Injection stroke may be too small for mold (ie. not enough resin is being injected). Injection speed may be too slow causing freezing before mold is
预算 capital expenditures 资本支出预算 cash 现金预算 pleting the cash 完全现金预算 cost of goods sold 销货成本预算 direct labor cost 直接人工 成本 预算 direct materials purchases 直接材料采购预算 factory overhead cost 制造费用 预算 factory
nt to the Loan Agreement or by the Guarantor. 本保函的担保金额将随借款人或我方已支付的金额递减。 When the Guaranteed sums have been paid in full by the Borrower and/or the Guarantor, this Guarantee shall automatically cease
l carried. To eliminate this problem, a signal transmission system was developed. This system is usually either pneumatic or electrical. And control instruments in one location. This makes it
运费 freight 信用证 letter of credit L/C 表 2 装箱单 (packing list)上的主要內容 中文 英文 英文缩写 中文 英文 英文缩写 装箱单 packing list 净重 weight . 件数 packages PKGS 所附单证 documents attached 毛重 gross weight 单证 documents DOC(S) 表 3 提单
retention money guarantee 保留金保证书 documents of title to the goods 物权凭证 authority to purchase (a/p) 委托购买证 letter of indication 印鉴核对卡 letter of hypothecation 质押书 general letter of hypothecation 总质押书
ck 挂置毛巾的架子 衣帽架 Coatrack 挂置衣服的架子 杂物桶 Sundries barrel 放置闲杂物品的箱子 壁 炉 Fire place 装饰性家具 4. 家具其它零、部件 柱 颈 Necking 几类家具的上部装饰部件 柱 身 Scapus 几类家具主体部件 腿 Leg 直接支撑面板(或顶板)的落地部件 7 脚 Leg 家具底部支撑主体的落地部件 塞 角 Block