专业英语
en now Mr Obama insists he is “mitted to pursuing expanded trade and new trade agreements”, and this week he defended his action as nothing more than the enforcement of trade laws. 讫今
标准电话线路和传统的调制解调器提供 一般的 的拨号服务。 Although still the most popular type of connection service,dialup service is quite slow, and many users find it inadequate to meet their munication needs. 虽然仍然是最 受欢迎
Gas spring / 气体弹簧 Name plate / 铭牌 Stop bar / Stopschiene ( 각종 문에 부착 되어 있는데 문을 열고 닫을 때 손상을 방지하는 고무류 부품 ) 잘 모르면 ,사진으로 설명 한다 Step / 台阶 Yoke / 轭 Lever / 操纵杆 Handle / 把手 Pedal / 踏板 Anti slip / 防滑板 Drain
right material had to be chosen for the guideway. Three basic types of guideway girders had been installed at the TVE: concrete, steel, and a hybrid girder. The Tshaped hybrid girder, a
以下 安排生产。 某些生产调度功能,实现制造系统的网站。 故障诊断。 这涉及到诊断设备故障,准备预防性维修时间表,维护备件库存。 安全监测。 此功能可确保系统不会在不安全的条件下运作。 安全监测的目的是为了保护人类工人人手系统和设备组成的系统。 质量控制。 这种控制 功能的目的是缺陷,并可能拒绝由系统产生的缺陷的工 作单位。 运营管理。 管理制造系统的整体运作
both external tensile load and shear load, or a bination of these, then the simple bolted joint using hardened washers is a good solution. 当想要一个可以被拆开又不破坏被联接零件的联接时,而且这个联接又要有足够的强度以承受外拉力和剪力或这两种力的结合
substructure)基础( foundation) 摩天大楼( skyscraper)骨架( skeleton)框架( framework)运输( transport)高峰( summit) 外墙( exterior walls)承重墙( bearing walls)柱( post)过梁( lintel)墙厚( thickness)铸铁( castiron) 幕墙( curtain
e them in endless variations to achieve the desired results. Through finite element analysis , stresses can be applied to be a puter model and the results graphically displayed, giving the designer
MOS电路。 晶体管的测试在实际应用中,对晶体管须进行四项基本测试:增益、漏电流、击穿电压和开关时间。 所有这些测试最好用通用晶体管测试仪和示波器进行测试。 也可以用欧姆表测试。 这种简易的欧姆表测试可以了解晶体管是否漏电,是否有某些增益。 准确测试晶体管的唯一方法是在所用的电路中进行测试。 第四课 电 子 仪 器一、课文习题参考答案Ⅰ.(1) 调节频率细调旋钮 (2) 两对偏转板 (3)
产工艺 ,采用传统加工过程不可行 ,满意或经济因特殊原因如下所示 : 1. Very bard fragile materials difficult to clamp for traditional machining。 1。 非常脆 弱的材料很难夹巴德传统加工。 2. When the workpiece is too flexible or slender, 2。 当工件太灵活或苗条 ,